Beverly Hills East Lift Station
Clients
-
PBM Constructors
-
JB Coxwell Contracting
-
Thompson Pump
-
Control Package provided by Economy Control Systems
-
Xylem / Flygt submersible pumps
-
JEA Water & Sewer
Location
Jacksonville, Fl
Year
2023
This class II lift station was part of the Beverly Hills East septic tank phaseout project. Customers in this neighborhood were able to abandon their septic systems and have their homes successfully connected to city sewer. JB Coxwell Contracting handled the site work and development throughout the community while we assisted PBM Constructors with lift station infrastructure. This pump station contains a new control package from ECS, 20 HP Flygt submersible pumps and a backup pony pump from Thompson. Freedom Electrical was able to provide the new electrical infrastructure on site along with wiring of all control systems.